We coordinate the full top package: field template after cabinet set, fabrication scheduling, sequenced installs with sink cutouts and finished seams — so the kitchen line never waits on stone.
Multi-unit top packages of every shape:
| Material | Pros | Note |
|---|---|---|
| Quartz | Consistent, durable | Most multifamily specs |
| Granite | Natural, hard | Color varies by lot |
| Solid surface | Seamless, repairable | Back-of-house |
| Porcelain slab | Thin, modern | Premium amenity |
Exact spec confirmed at takeoff — ask for unit pricing.
Field-templated after set — not from drawings — so seams land right.
We chase fabrication so installs hit the unit schedule.
Sink, faucet and cooktop cutouts finished and sealed.
Tops follow cabinets immediately — no stalled units.
We run a vetted fabrication network and own the schedule — one throat to choke either way.
Quartz wins for consistency across hundreds of units; we'll price both.
Template within days of set; installs typically 7–14 days behind, sequenced by floor.
Chips, seams and resets on existing programs — ask for our service rate.
Yes — send a sample or unit number and we'll match material and edge.
Send plans today and get a trade-by-trade bid within 72 hours — unit-priced, easy to level.